Exterior facade for coastal dual occupancy

BUILDING DUAL OCCUPANCY HOMES ON THE CENTRAL COAST: A USER-FRIENDLY GUIDE

If you’re thinking about building a dual occupancy dwelling on the Central Coast, it’s crucial to get familiar with the Central Coast Council’s guidelines.

These regulations can be a bit tricky, so I’ve put together this guide to help you navigate the process.
I’ll cover everything from Development Applications (DAs) to Complying Developments (CDCs) and offer practical tips along the way.

WHAT IS A DUAL OCCUPANCY?

A dual occupancy is a property with two separate homes on a single lot which can usually be subdivided. Sometimes called duplexes, these homes offer flexible living arrangements for homeowners or investors.

BENEFITS OF DUAL OCCUPANCY HOMES

Spacious layout in a modern coastal home

Building a dual occupancy home has plenty of advantages, especially in an R2 low-density residential zone. It can provide additional rental income and make it possible to live near ageing family members while still maintaining separate dwellings.

Alternatively, it also provides a variety of exit options and strategies such as keeping both dwellings, selling 1 and keeping the other or selling both. Consider a variety of design options and think outside the square to see which best suits your project.

For example, you may be able to retain an existing dwelling and build a new dwelling as the second home, rather than immediately thinking you need to knock down the existing dwelling.

CENTRAL COAST COUNCIL DUAL OCCUPANCY APPROVALS

Front view of a Terrigal side-by-side duplex with off-form concrete frames, vertical batten screens, timber garage doors and sandstone garden walls
Terrigal dual occupancy

AI-generated visualisation based on our design

If you’re planning a dual occupancy project, understanding the approval process for both DAs and CDCs is essential.

The process can be complex, so getting expert advice from an architect, building professional, town planner, and certifier early on is critical. This will also assist in identifying site constraints and managing project risks.

DEVELOPMENT APPLICATIONS (DA)

The DA process is often more involved and is required when a proposed development doesn’t comply with the CDC requirements or when variations are required to planning controls.

For example, properties in bushfire or flood risk areas may not qualify for a CDC.

Here’s what you might need:

  • Bushfire reports
  • Flood Information Certificate
  • Geotechnical Report
  • Quantity Surveyor Report
  • Waste Management Plan
  • Stormwater Drawings
  • Landscape Drawings
  • Arborist Report
  • Acoustic Report
Open Floor Plan
Coastal Duplex, Terrigal

Hand drawn sketch concept design

SUBMITTING THE DA:

Gather the consultant reports and prepare your application. Your architectural drawings need to be accompanied by a BASIX certificate before submission.

AFTER THE DA:

The Council will outline their Conditions of Consent once your DA is approved. Address these conditions before applying for a Construction Certificate (CC).

APPLYING FOR A CONSTRUCTION CERTIFICATE (CC):

After meeting your DA conditions, your Architect will coordinate with a Structural Engineer and any other consultants that are required for your project on your behalf.

Your Architect will then submit the Construction Certificate documents to a certifier via the NSW planning portal. Engaging the certifier early can help make the final approval process smoother and identify a checklist of the project requirements.

COMPLYING DEVELOPMENT CERTIFICATE (CDC)

A Complying Development Certificate (CDC) can be a faster way to get approval, but the rules are stricter. A CDC is assessed against the NSW Low Rise Housing Diversity Code, not Council’s DCP. It is issued by a private certifier or Council, usually within about 20 days if the design meets every standard.

To qualify, the lot generally needs to be at least 15 m wide at the building line and meet the Code’s rules for lot size, setbacks, height, landscaping and private open space. Some sites can’t use a CDC at all, such as those in heritage areas, high bushfire risk zones or certain flood areas.

A CDC combines planning approval and the construction certificate into one step, so you can start building sooner. If your site or design doesn’t fit the Code, a development application (DA) to Council is the way to go.

ADDITIONAL CENTRAL COAST COUNCIL DUAL OCCUPANCY SETBACK REQUIREMENTS

When planning your dual occupancy project, be mindful of various setback regulations as well as site specific constraints. These include front, rear, side, corner allotment, garage, and waterfront setbacks. Site specific constraints include impacts on privacy, views, site slope overshadowing and orientation.

Always check the Central Coast Council’s online mapping tool and any relevant consultants to ensure your property complies with these requirements before applying for a CDC. Engaging with the appropriate consultants throughout this process is crucial for a successful project.

For example, if your site is mapped as bushfire prone land, it would be prudent to look more closely into this or consult with a Bushfire consultant in order to minimise this risk.

Always consult the Central Coast Council’s Development Control Plan 2022 in conjunction with the CDC setback requirements and speak with an architect and a certifier to ensure you meet all specific requirements.

TIPS FOR CREATING A SUCCESSFUL DUAL OCCUPANCY

Open Floor Plan
Coastal Duplex, Terrigal

1. UNDERSTAND AND ADHERE TO COUNCIL REQUIREMENTS:

  • Local regulations on site coverage, lot sizes, setbacks, landscaping, and open space can be complex.
  • Use Central Coast Council’s Online Mapping to determine your property zoning and familiarise yourself with the specific regulations.
  • Consult with experts such as Architects, Town Planners and Certifiers to confirm your initial due diligence.
Coastal home with weatherboard
Coastal Duplex, Terrigal

2. OPTIMISE SPACE & PRIVACY:

  • Ensure both homes have optimised space and privacy.
  • Use clever design to orient living spaces and bedrooms for natural light while preserving privacy.
  • Your architect will be able to assist you on the best ways to incorporate natural screening and noise reduction features.
  • By spending time developing an architectural design that provides a high level of amenity you will achieve a higher quality building.
Coastal home with weatherboard
Coastal Duplex, Terrigal

3. BALANCE AESTHETIC AND FUNCTIONALITY:

  • Don’t compromise on aesthetic value for more building area. Buildings that respond to their context and in response to the site features add value.
  • Use materials like stone, timber, and glass to complement your surroundings and that maximise the outlook without compromising on privacy.

NEW NSW HOUSING RULES AND CENTRAL COAST LOT SIZES

On the Central Coast, an attached dual occupancy generally needs a lot of at least 550 m², and a detached one at least 700 m² (Central Coast LEP 2022). Sloping sites with front-and-rear designs may need larger lots under Council’s DCP.

Since 28 February 2025, the NSW low and mid-rise housing reforms let some sites use state standards instead. These sites are within about 800 m of nominated centres, including Gosford, Woy Woy, Wyong, Erina Fair, Green Point, The Entrance and Tuggerah. The standards are a 450 m² lot, 12 m frontage, 0.65:1 floor space ratio and 9.5 m height. Each lot can then be subdivided down to 225 m².

All new homes must also meet BASIX, which since October 2023 includes a minimum 7-star energy rating. Good orientation, insulation and shading help reach it without relying on expensive add-ons.

FAQS ABOUT CENTRAL COAST COUNCIL DUAL OCCUPANCY

WHAT ARE THE REQUIREMENTS FOR DUAL OCCUPANCY IN NSW?

  • Requirements include minimum lot size and width, floor space ratio (FSR), building height, setbacks and the controls in your council’s local environmental plan. Since 28 February 2025, sites in NSW low and mid-rise housing areas can also use state standards: a 450 m² lot, 12 m frontage, 0.65:1 FSR, 9.5 m height and one car space per home.

WHAT IS THE DIFFERENCE BETWEEN DUAL OCCUPANCY AND DUPLEX?

  • A duplex is a type of attached dual occupancy, with two homes sharing a common wall on one lot. Each owner only owns their own half of the land once the lot is subdivided onto separate titles, which needs its own approval. Other dual occupancy layouts include detached homes and front-and-rear designs.
Coastal home with weatherboard
Terrigal dual occupancy

AI-generated visualisation based on our design

CAN I BUILD A DUPLEX ON R2 ZONING CENTRAL COAST?

  • Yes. Dual occupancies are permitted in the R2 zone across the Central Coast under the Central Coast LEP 2022. Approval can come through a development application (DA) to Council, or a complying development certificate (CDC) from a private certifier if the site qualifies. Near Gosford, Woy Woy, Wyong, Erina Fair, Green Point, The Entrance and Tuggerah, the 2025 NSW low and mid-rise housing rules may also allow smaller lots, from 450 m².

WHAT IS THE DIFFERENCE BETWEEN ATTACHED AND DETACHED DUAL OCCUPANCY?

  • An attached dual occupancy has two homes that share a common wall. A detached dual occupancy has two separate buildings on the one lot. On the Central Coast, an attached dual occupancy generally needs a lot of at least 550 m² and a detached one at least 700 m².
Coastal home with weatherboard
Terrigal dual occupancy

Hand drawn sketch concept design

CATHY’S WRAP

Dual occupancy developments on the Central Coast are a popular option, providing rental income, increased property value, and opportunities for multi-generational living.

Familiarise yourself with dual occupancy and CDC requirements by visiting the Central Coast Council website to navigate the development process smoothly.

If you are unsure how the planning requirements will affect your project or you want assistance in achieving the best outcome for the design of your project, get in touch with an Architect or Town Planner.

FURTHER INFORMATION

CENTRAL COAST COUNCIL DUAL OCCUPANCY

  • Download the Central Coast Council – Dual Occupancy and Multi Dwelling Housing documentation, it’s a practical design guide for dual occupancy and multi-dwelling housing to enhance quality and amenity.

STATE ENVIRONMENTAL PLANNING POLICY (EXEMPT AND COMPLYING DEVELOPMENT CODES)

  • Click here to view the NSW State Environmental Planning Policy, it’s a streamlined assessment for development with State-wide codes for exempt and complying projects.

READ MORE:

NOTE

While every effort is made to ensure that the information contained within this article is accurate and up to date, Slater Architects makes no warranty, representation or undertaking whether expressed or implied, nor does it assume any legal liability, whether direct or indirect, or responsibility for the accuracy, completeness, or usefulness of any information.

Cathy Slater: MAM (Arch) AIA
Principal Architect